Representative capabilities
The frame behind the project.
Engagement profiles describing the structural systems we work with, the scope each one carries, and the documents that come out of it. Anonymized by default; named case studies are published only with client permission.
- Profiles
- 06
- Coverage
- Miami-Dade & Broward
- Systems
- Reinforced concrete, steel
Representative capabilities
Mid-rise residential frame
- Project type
- Residential — new construction
- Location
- Miami-Dade County, FL
- Scope
- Full structural design: gravity and lateral systems, foundations, detailing
- Structural system
- Reinforced concrete flat plate with shear-wall core
- Deliverables
- Structural drawing set · Calculations · General notes
- Codes
- ACI 318 · ASCE 7 · Florida Building Code
- Status
- Representative scope
Coastal condominium recertification
- Project type
- Existing building — recertification
- Location
- Broward County, FL
- Scope
- Notice review, structural inspection, findings, repair recommendations, reinspection
- Structural system
- Reinforced concrete frame with cantilevered balconies
- Deliverables
- Recertification report · Photographic record · Repair scope
- Codes
- Florida Building Code · County recertification requirements
- Status
- Representative scope
Milestone structural inspection
- Project type
- Existing building — safety inspection
- Location
- South Florida
- Scope
- Visual structural inspection, concrete distress mapping, prioritized findings
- Structural system
- Reinforced concrete frame, post-tensioned slabs
- Deliverables
- Inspection report · Distress mapping · Follow-up scope
- Codes
- Florida Building Code · Milestone inspection requirements
- Status
- Representative scope
Foundation system for a constrained site
- Project type
- New construction — foundations
- Location
- Miami-Dade County, FL
- Scope
- Foundation design against geotechnical report, settlement and uplift verification
- Structural system
- Mat foundation with grade beams; deep foundations at transfer zones
- Deliverables
- Foundation drawings · Reactions schedule · Calculations
- Codes
- ACI 318 · ASCE 7 · Florida Building Code
- Status
- Representative scope
Multi-discipline BIM coordination
- Project type
- New construction — coordination
- Location
- South Florida
- Scope
- Structural modelling, model federation, interference checking, issue tracking
- Structural system
- Reinforced concrete frame with long-span transfer beams
- Deliverables
- Structural model · Clash & issue reports · Model-derived drawings
- Codes
- ISO 19650 information management
- Status
- Representative scope
Independent structural peer review
- Project type
- Design review — third party
- Location
- South Florida
- Scope
- Independent review of drawings and calculations, comment log, close-out tracking
- Structural system
- Reinforced concrete and structural steel, mixed system
- Deliverables
- Review report · Prioritized comment log · Resolution record
- Codes
- ACI 318 · ASCE 7 · AISC 360 · Florida Building Code
- Status
- Representative scope
Representative engagement profiles — anonymized scope, structural systems and deliverables. Named project case studies are published only with client permission.
Six stages. No hand-offs into silence.
Assess
01Understand the building, the site and the constraint.
Scope, governing code and risk are fixed before design starts.
- Deliverable
- Scope definition & code basis
Analyze
02Model the structure and quantify the demand.
Gravity, wind and seismic demand established for the real site.
- Deliverable
- Analysis model & load documentation
Coordinate
03Resolve structure against architecture and MEP.
Conflicts are found in the model instead of in the field.
- Deliverable
- Federated model & issue log
Detail
04Draw it so it can be built.
Reinforcement, connections and interfaces resolved on paper.
- Deliverable
- Structural drawings & details
Review
05Check the work independently before it leaves.
Calculations, drawings and coordination verified as one set.
- Deliverable
- Internal review record
Deliver
06Issue, submit and stay on the project.
Comments, RFIs and submittals answered by the engineer who designed it.
- Deliverable
- Issued set & construction-phase support
The material
Reinforced concrete, reinforcement, residences and the coastline they stand on — the vocabulary of the work, uncaptioned on purpose.












Licensed architectural photography, shown as material rather than as portfolio. No image on this page depicts a Tercero Tablada project.
Bring us the structure. We’ll carry the responsibility.
Tell us about your project, building or compliance requirement. We will help define the appropriate engineering scope and next steps.








