What is a milestone inspection?

  1. 01 What it is

    Florida’s structural inspection of condominium and co-op buildings, in two phases, met in Miami-Dade and Broward through the county program.

  2. 02 Who it is for

    Condo and co-op boards asking whether the state law reaches them, and buyers, lenders and insurers with a reason to look.

  3. 03 What you get

    A clear answer on which rules reach the building, the inspection report, and the summary the board shares with owners.

Read the full explanation

Florida’s milestone law overlaps with Miami-Dade’s recertification and with Broward’s Building Safety Inspection Program, and it is easy to conclude that a building owes two separate inspections — the state’s and the county’s. In Miami-Dade and Broward the milestone inspection is met through the county program. What a board needs is someone to say which rules reach the building, what was actually observed, and what has to happen next.

  • 01Your board needs to know whether Florida’s milestone law reaches the building, and how it is met in your county.
  • 02A report found substantial structural deterioration, and the further investigation it calls for — testing or opened finishes — has to be scoped and carried out.
  • 03There is no notice, but there is a reason to look: a purchase, visible distress, or a lender’s or insurer’s request.

Condominium and cooperative associations · Buyers, lenders and insurers · Owners and managers of aging or coastal buildings

The law’s clock

  1. 3 stories

    Habitable, in a condominium or co-op building

  2. 30 years

    First due, from the certificate of occupancy

    25 where the local enforcement agency requires it

  3. 10 years

    Then again, every ten years

  4. 2 phases

    The second only where the first finds substantial structural deterioration

The buildings it reaches

One kind of building: the residential condominium.

Florida’s milestone law reaches condominium and cooperative buildings of three habitable stories or more — the towers on the water, the mid-rises inland, the garden condominium of three floors and the condo homes above a row of shops. In Miami-Dade and Broward, every other building answers to the county’s own program.

  • Condominium towers on the water

  • Condominium towers

  • Mid-rise condominiums

  • Garden & walk-up condominiums

  • Co-op apartment buildings

  • Condo homes over shops

Outside the law

  • Rental apartment buildings
  • Offices, shops, hotels and warehouses
  • Commercial condominiums
  • One- to four-family homes of three stories or fewer

In Miami-Dade and Broward those buildings still answer to the county’s program.All six services

What's included

  • 01 Which rules apply

    First we tell you whether the state law, your county’s program, both or neither reach the building.

  • 02 Structural inspection

    We inspect the building’s main structure visually, photograph what we find and record where each condition is.

  • 03 Balconies, walkways & railings

    The structural review takes in the balconies, the walkways and the railings.

  • 04 Concrete damage mapped

    We map where the concrete is cracking, breaking away or showing rust stains, and separate what is cosmetic from what is structural.

  • 05 Further investigation

    Where a report finds substantial structural deterioration, we plan the tests or openings it calls for, placed where they disturb least.

The full scope, line by line
  1. Review of which rules reach the building — the state milestone law, the county program, or neither
  2. Visual inspection of the primary structural system
  3. Balcony, walkway and railing structural review
  4. Concrete distress mapping — spalling, cracking, corrosion staining
  5. Further investigation where a report found substantial structural deterioration, with testing located where it disturbs least
  6. Separating cosmetic from structural, and urgent from monitorable

What you receive

  1. Inspection report with photographic record
  2. Condition findings organized by priority
  3. Summary of findings for unit owners, for condos and co-ops
  4. Scope and findings of any further investigation the inspection calls for
  5. Signed and sealed documents where the scope requires it

Next step

Tell us the building’s county, age and number of stories, and what raised the question — a notice, a report, a sale. We reply with which rules apply and a proposal for the inspection.

How the work runs

01

Applicability

We confirm which rules reach the building and what any notice in hand is asking for. Where a county program applies, the work runs as that program, and our team delivers the complete package that county asks for.

02

Records review

Available drawings, prior reports and repair history reviewed before the site visit.

03

Field inspection

Systematic visual inspection with photographic documentation and location mapping.

04

Evaluation

Observations evaluated structurally — distinguishing cosmetic from structural, and urgent from monitorable. Where deterioration is substantial, the further investigation is scoped.

05

Report

Findings issued with clear priorities and, for condos and co-ops, a separate summary the board can send to unit owners.

What clients say

  • Our board had been going back and forth over the milestone inspection for weeks. We finally had a call with their team and got our questions organized. Having the scope explained before scheduling the visit made the whole thing feel less overwhelming.

    Daniela P.
  • I manage the property, so access and resident notices were my main concerns. They explained where access would be needed, and we planned around that. The inspection day went smoothly.

    Thomas B.
  • The report was detailed, and there were a couple of terms I didn’t understand at first. I emailed my questions and received an explanation I could share with the rest of our board. I appreciated that Tercero Tablada took the time to help us understand what we were reading.

    Mariana D.

When it applies

State of Florida — milestone inspection

Applies to
Condominium and cooperative buildings of three habitable stories or more
First due
By December 31 of the year the building reaches 30 years, counted from the certificate of occupancy — 25 years where the local enforcement agency requires it, for conditions such as proximity to salt water
Then
Every 10 years
Phase two
Only where phase one finds substantial structural deterioration
Unit owners
Within 14 days of receiving the notice, the association tells unit owners about the required inspection and the date it must be completed; within 45 days of receiving the report, it sends every owner the engineer’s summary, posts it in a conspicuous place on the property, and publishes the report and the summary on its website where it is required to have one

Florida Statute 553.899 · Last verified:

The board’s duties to unit owners apply in either county.

Recertification, BSIP, milestone inspection and SIRS, side by side

Miami-Dade recertification

Who requires it
Miami-Dade County. The notice comes from the Building Official of your city, or from the county in unincorporated areas.
Which buildings
Almost every building other than single-family homes and duplexes; the full list is on the Miami-Dade page.
What it produces
A structural report and an electrical report, each on the county’s own form, filed with the certificates and attachments the county asks for.
Where it is filed
With the Building Official who sent the notice.

Broward BSIP

Who requires it
Broward County, through its Board of Rules and Appeals. Your city’s Building Official enforces it.
Which buildings
Almost all building types, in every Broward city; the homes and minor structures outside it are listed on the BSIP page.
What it produces
A written narrative report with the Board’s own structural and electrical forms and color photographs.
Where it is filed
With your city’s Building Official.

State milestone inspection

Who requires it
The State of Florida.
Which buildings
Condominium and cooperative buildings of three habitable stories or more.
What it produces
A phase one inspection report and, only where phase one finds substantial structural deterioration, a phase two. In Miami-Dade and Broward the county report serves as it.
Where it is filed
With the association and the Building Official — in Miami-Dade and Broward, as the county program’s report.

Structural integrity reserve study (SIRS)

Who requires it
The State of Florida, under its condominium and cooperative laws.
Which buildings
Residential condominium and cooperative buildings of three habitable stories or more.
What it produces
A reserve study, not an inspection report: what the roof, the structure and the other parts of the building the law lists will cost to repair or replace, and what the association should set aside each year.
Where it is filed
The association shares it with unit owners and tells the state’s condominium division that it was completed.

Source: Code of Miami-Dade County, Section 8-11(f) · Broward County Board of Rules and Appeals, Policy #05-05 · Florida Statutes 553.899, 718.112 and 719.106 · Last verified:

Good to know

Which buildings the law reaches, and what an inspection can see.

All 5 notes
  • The state law reaches only the condominium and cooperative buildings described above. Other buildings can still fall under a county program, which covers almost every building type.
  • Further investigation is as limited or as extensive as the distress requires. Its scope is set from what the inspection finds, not before.
  • Visual inspection covers accessible, observable conditions. Concealed deterioration may require testing or selective demolition.
  • For buildings over three stories or 50 feet, each county requires the structural report to come from an engineer with additional qualifications. We confirm this for your building before we propose.
  • An inspection reports condition at a point in time; it is not a warranty of future performance.

Contact

Get in touch.

Tell us about the building and what you need from us. Write in English or in Spanish.

Attachments optional

Photographs, drawings or reports. PDF, images, DWG, DXF or ZIP, up to 25 MB each, five files.