The inspection most owners still call the 40-year recertification. Send us the notice from your city or the county.

A phone photo of the letter is enough. No notice yet? Send the address and the year built.

Time to file
90 days from the Notice of Required Inspection. Courtesy notices should arrive two years and one year ahead; not receiving them does not move the deadline.
Engineer
Juan Tercero, PE., M.Sc. · Florida PE 105256 · Verify with the Florida DBPR
FL Engineering Business No. 40285

When you need it

A notice arrives with a deadline.

Building recertification is Miami-Dade County’s periodic safety inspection of older buildings, structural and electrical, reported in writing to your Building Official. The Notice of Required Inspection comes with forms and very little explanation of what actually has to happen. Boards and owners need a structural engineer who knows the county’s sequence and can carry the structural side of it from the first site visit to the report that closes the recertification.

  • 01A Notice of Required Inspection has arrived from your city or from Miami-Dade County — or a courtesy notice says one is on its way.
  • 02A previous report listed repairs and the recertification is still open.
  • 03You are buying or managing a Miami-Dade building and want to know where it stands in the recertification cycle.

Condominium, cooperative and homeowner associations · Property managers · Building owners and asset managers

Scope & deliverables

What a Miami-Dade recertification inspection includes

  1. Review of the notice, the building’s records and prior reports
  2. Structural inspection on site — frame, slabs, balconies, facade, roof and foundations
  3. Classification of observed conditions by structural significance
  4. Repair scope defined so contractors bid the same work
  5. Reinspection of completed repairs
  6. Answers to the reviewing office’s questions on the structural report

What you receive

  1. Structural recertification report on the county’s own form, signed and sealed
  2. Photographic record of observed conditions
  3. Written repair scope where repairs are needed
  4. Letter on whether the building can remain occupied during repairs, where required
  5. Amended report after repairs

Next step

Send the notice — a phone photo is enough — or the address and the year built. We confirm what your Building Official is asking for and reply with a proposal for the inspection and the structural report.

Engineer
Juan Tercero, PE., M.Sc. · Florida PE 105256 · Verify with the Florida DBPR
FL Engineering Business No. 40285

When it applies

Who has to recertify in Miami-Dade, and when

Miami-Dade County

Applies to
Almost every building type — condominiums, co-ops, apartments, offices, retail and industrial. Outside the program: single-family homes, duplexes, and buildings with both an occupant load of 10 or less under the Florida Building Code and a gross area of 2,000 sq ft or less.
First due
At 30 years — 25 for condominium and cooperative buildings of three or more stories within 3 miles of the coast. Age is counted from the year built on the Property Appraiser’s record.
Then
Every 10 years, for the life of the structure.
Time to file
90 days from the Notice of Required Inspection. Courtesy notices should arrive two years and one year ahead; not receiving them does not move the deadline.
If repairs are needed
150 days from the Notice to finish repairs that need no permit and to obtain permits for the rest. Permitted work then follows its permit, and an amended report closes the recertification.
Condominiums & co-ops
The recertification serves as compliance with the state milestone inspection — no separate milestone report is filed.

Code of Miami-Dade County, Section 8-11(f)

The notice comes from the Building Official of your city, or from the county in unincorporated areas, and the report is filed with that same office. For condominium and cooperative buildings of three habitable stories or more, the recertification report serves as the state milestone inspection, and the board’s duties to unit owners under state law (Florida Statute 553.899) remain.

What the board must do

  • Within 14 days of receiving the notice, tell unit owners about the required inspection and the date it must be completed.
  • Within 45 days of receiving the report, send every owner the engineer’s summary and post it in a conspicuous place on the property.
  • In those same 45 days, publish the report and the summary on the association’s website, where the association is required to have one.

Last verified: October 4, 2026

Building in Broward?See the BSIP

Send the Miami-Dade Notice

A phone photo of the letter is enough. No notice yet? Send the address and the year built.

The proposal is free. We usually reply within two hours.

Questions & answers

Questions boards ask about Miami-Dade recertification

Is this the 40-year recertification?

Yes. “40-year recertification” is the name most owners still use for Miami-Dade’s building recertification, from the years when the first inspection fell due at that age. The program is the same; the first inspection now falls due earlier, at the ages under “First due” in the table above.

We received the notice. What do we do first?

Send it to us — a phone photo of the letter is enough. We read the notice and the building’s history, confirm what your Building Official is asking for and by when, and reply with a proposal for the inspection and the structural report. In a condominium or cooperative of three habitable stories or more, the board also has duties to unit owners: see “What the board must do” above.

How long do we have?

The “Time to file” row in the table above gives the time for the report, and “If repairs are needed” the time for what follows; both are counted from the Notice of Required Inspection. Send us the letter first: we confirm from it what your Building Official is asking for, and by when.

Does our building have to recertify, and which buildings are exempt?

Almost every building does. The “Applies to” row above lists the building types and the few that are outside the program, and “First due” gives the age at which the first recertification falls due, counted from the year built on the Property Appraiser’s record.

We never received a notice. Are we exempt?

No. A building comes under the program because of its type and its age — the “Applies to” and “First due” rows above — not because a letter arrived. Courtesy notices should arrive ahead of time, and not receiving them does not move the deadline. No notice yet? Send the address and the year built.

Can we get an extension?

One can be requested, to file the report or to obtain permits, and it is the Building Official who grants it. The request comes from the engineer, signed and sealed, and states that the building can remain occupied. How long an extension may run is under “Good to know”, further down this page.

Do we have to bring the building up to today’s code?

No. The building is judged against the code in force when it was built. Recertification does not require bringing it up to today’s code.

Is this the same as the state milestone inspection?

For condominium and cooperative buildings of three habitable stories or more, the recertification report serves as the state milestone inspection, and no separate milestone report is filed. What state law adds for those buildings is the board’s duties to unit owners, listed under “What the board must do” above. Other buildings are outside the milestone law and answer only to the county’s program.

Who do we file the report with?

With the office that sent the notice: the Building Official of your city, or the county in unincorporated areas. Each city runs its own notices and filing, and may have its own forms. Questions about a notice go to the office that sent it, and we read your city’s letter first.

What if the report lists repairs?

The report is filed anyway: the county asks for it first, not after the work. Where repairs are needed, we define what has to be corrected so contractors bid the same work; repairs that need a permit wait for it, and an amended report stating that the repairs are complete closes the recertification. The time allowed is in the “If repairs are needed” row above.

What happens if we miss the deadline?

Miami-Dade County’s recertification page says that when a recertification is not obtained in time, a citation is issued without further notice and the case is referred for enforcement; penalties can then accumulate, and a lien can follow. Each city handles its own cases, so the office that sent your notice sets the steps and the amounts. Past the date on your notice? Send the notice and any citation; the first step is getting the inspection done and the report filed.

Our older building was never recertified. Are we late?

It may be. When the county shortened the schedule, it set a single catch-up date for the buildings that were already past the new ages, and that date has passed; buildings already recertified under the earlier schedule keep the one they were on. Send the address and the year built, and we confirm what applies to the building before we propose.

Source: Code of Miami-Dade County, Section 8-11(f) · Last verified: October 4, 2026

How the work runs

How a recertification runs, step by step

01

Notice review

We read the notice and the building’s history, and confirm what the Building Official is asking for and by when.

02

Inspection

Structural inspection on site — frame, slabs, balconies, facade, roof and exposed foundations — documented with photographs tied to their locations.

03

Report filed

The structural report goes on the county’s own form, signed and sealed, and is filed even when it lists repairs. The county asks for the report first, not after the work.

04

Repairs under permit

Where repairs are needed, we define what has to be corrected so contractors bid the same work. Repairs that need a permit wait for it, then follow its schedule.

05

Reinspection

Completed repairs are reinspected and documented against the original findings.

06

Close-out

An amended report states that the repairs are complete. That is what closes the recertification, until the next cycle.

Good to know

Reports, forms and the limits of an inspection.

  • Miami-Dade’s program asks for a structural report and an electrical report. We prepare the structural report; the electrical report is signed by a professional qualified in electrical design.
  • Buildings over three stories or 50 feet are “threshold buildings”, and their structural report must come from an engineer with the additional qualifications Miami-Dade County requires. We confirm this for your building before we propose.
  • The structural and electrical reports go on the county’s own forms; a firm’s own form is not accepted. The county’s packet also includes certificates for parking-lot illumination and, where a lot is next to water, guardrails.
  • The Building Official may grant an extension of up to 60 days to file the report or to obtain permits, on a signed and sealed request from the engineer stating that the building can remain occupied.
  • The amended report that closes a recertification comes from the engineer or architect who filed the original report. If another firm filed yours, say so when you write — we confirm what closing it will take before we propose.
  • A condition that puts life or property in danger is reported to the owner and to the Building Official; the engineer has a duty to do so.
  • A report documents observed conditions; concealed ones may need further investigation, and no engineer can guarantee how a reviewing office will act on it.

Next step

Tell us about the building. We reply with a scope.

A county notice in your hand, a building that worries you or a new project — describe it and attach what you have. A phone photo of the letter is enough. You hear back from the engineer, with questions or with a written proposal.

The proposal is free. We usually reply within two hours.

info@ttcivilstructural.comMiami-Dade & Broward County, Florida