Skip to content

New structures

BIM Modeling & Coordination

BIM Modeling & Coordination

Coordinated digital models that resolve conflicts before they reach the field and produce clearer structural deliverables.

Service
03
Applies to
New construction
Basis
ISO 19650 · Model-based coordination
01What it solves

Why it matters

Most conflicts between structure, architecture and MEP are discovered on site, where they are most expensive to fix. A coordinated model moves that discovery back into design, where it costs a conversation instead of a change order.

Who this is for

  • Design teams running multi-discipline coordination
  • Contractors requiring model-based deliverables
  • Owners who want the as-designed model to survive into operations
02Typical scope

What the work covers

  1. Structural modelling — foundations, columns, slabs, walls, framing
  2. Federation of structural, architectural and MEP models
  3. Interference checking and clash resolution tracking
  4. Model-derived drawings, schedules and quantities
  5. Coordination meetings and issue reporting
  6. Model delivery aligned to project information requirements
03Process05 stages
01

Set the rules

Shared coordinates, level and grid naming, model breakdown and level of information agreed before modelling starts.

02

Model the structure

The structural model is built as the design source, not as a drafting by-product.

03

Federate

Discipline models combined and checked against each other on a fixed cycle.

04

Resolve

Conflicts logged, assigned and tracked to closure — with the structural fix engineered, not improvised.

05

Deliver

Drawings, schedules and the model itself issued as one consistent set.

04Deliverables & considerations

What you receive

  1. Structural model at the agreed level of information
  2. Clash and issue reports with resolution status
  3. Model-derived drawings and schedules
  4. Coordination record for the project file

Considerations

  • Coordination quality depends on what the other disciplines deliver and when; the process is collaborative by definition.
  • A model is not a substitute for a signed and sealed drawing set — it supports it.
  • Level of information should match the decision being made, not the largest number available.
  • ISO 19650
  • Model-based coordination
05Software & open standardsToolchain

Software & open standards

The model has to survive the hand-off.

We work in the tools the rest of the project team already uses, and exchange through open formats so the model does not become a dead end when it leaves our office.

  • Revit logoRevitStructural modelling
  • Navisworks logoNavisworksClash detection
  • Autodesk logoAutodeskPlatform
  • CYPE logoCYPEStructural analysis
  • BCF logoBCFIssue exchange
  • buildingSMART logobuildingSMARTIFC / openBIM

Product names and logos are the property of their respective owners and are shown to identify the software used in our workflow.

07StartNext step

Bring us the structure.We’ll carry the responsibility.

Bring us the structure. We’ll carry the responsibility.

Tell us about your project, building or compliance requirement. We will help define the appropriate engineering scope and next steps.

info@tercerotablada.comMiami-Dade & Broward County, Florida