Pricing
Know your engineering fee up front: fixed-fee ranges for the Miami-Dade recertification and the Broward BSIP across South Florida, by building size, and what sits outside that fee.
- Miami-Dade recertification
- From $2,500
- Broward BSIP
- From $2,000
The fee
The engineering fee, by building size.
One fixed figure, written in the proposal before any work starts: no hourly billing, and no charge for the proposal itself. Most buildings fall in these ranges; your fixed figure is written in the proposal. Indicative, not an offer.
Prices reviewed October 2026
| Building size | Miami-Dade recertification | Broward BSIP |
|---|---|---|
| Small commercial or multifamily building | From $2,500 | From $2,000 |
| 3–10 units, or a comparable commercial building | $3,500 – $5,500 | $3,000 – $5,000 |
| 11–40 units, or a property with several buildings | $5,500 – $9,500 | $5,000 – $9,000 |
| Large or complex property | Custom proposal | Custom proposal |
| Building Recertification: what it includes→ | Building Safety Inspection Program (BSIP): what it includes→ |
In the fixed fee
- Structural and electrical inspection of the building.
- The structural report, signed and sealed, and the electrical report.
- Filing with the county and our answers to the review comments on that inspection.
Outside the fee
- RepairsIf the inspection finds deficiencies, a contractor prices the repairs once their scope is known, under a building permit. Their cost depends entirely on what is found.
- Filing and permit feesThe office that sent the notice charges its own filing and permit fees, and changes them from time to time. Ask that office for its current schedule: the filing step is in our process, its fee is not in our price.
- Penalties for a late reportA report that misses its date moves to enforcement, with penalties and costs set by the county or the city: the one cost an early start avoids. Already late? It can still be resolved.
What moves the price
Why two buildings of the same size can cost differently.
The range is set by size. Where a building falls inside it depends on six things.
Call the day the notice arrives, or today if its date has passed: the earlier the inspection, the more room to plan the repairs.
| Factor | Pay less | |
|---|---|---|
| Floors, units and square feet | They set how long the inspection takes and how long the reports run. | |
| Number of structures | Each building, parking garage or detached structure on the property is inspected and reported on by itself. | With several buildings, ask for one proposal priced building by building. |
| The electrical service | A larger service takes longer to inspect, and the county’s rules can call for infrared thermography of the equipment; the proposal says when they do. | Have one team inspect the structure and the electrical together: one visit, one schedule, one contact. |
| Drawings and earlier reports | The original drawings and the last recertification report shorten the work. Without them, more is measured and documented on site. | Send the notice, the original drawings and any earlier report with your request. |
| Access on the day | Roofs, garages, electrical rooms and units that cannot be opened on the day of the inspection mean a second visit. | Open every area on one day: roofs, garages, electrical rooms and the units the engineer asks for. |
| The office that sent the notice | Each city and county office has its own forms and submission steps, and some ask for more than others. | |
Questions
Questions owners ask about the price.
Is the proposal free?
Yes. Asking for a proposal costs nothing and commits you to nothing. The fee is fixed in writing before any work starts.
Is the price fixed, or billed by the hour?
Fixed. The proposal states one figure for the scope it describes, and that is the fee for that scope.
Do the ranges include repairs?
No. Repairs, the documents they need and their permits are quoted apart, once the inspection has shown what is needed.
Are the county or city fees in the price?
No. The office that sent the notice charges them directly, at the amount it sets. We include the filing step, not the fee.
Does a property with several buildings cost more?
Each structure is inspected and reported on, so the total grows with the number of structures. One proposal prices each building separately.
How soon after the inspection do I get the reports?
The complete package, signed and sealed, is ready three to four days after the inspection. When a deadline is close, it can be ready in one to two days.
What do you need to give me a figure?
A phone photo of the notice is enough to start. The drawings or an earlier report, if you have them, let the figure come closer to the final one.
Contact
Get in touch.
Tell us about the building and what you need from us. Write in English or in Spanish.
- WhatsApp Message us on WhatsApp
- Email info@ttcivilstructural.com
- Where Across Florida


