Skip to content

Guide

Milestone inspection, recertification and SIRS: what a condo board owes

Three names, two laws, one building. In Miami-Dade and Broward, the county inspection and the state milestone inspection are one report — the reserve study is something else.

Engineer
Juan Tercero, PE., M.Sc. · Florida PE 105256

Guide

Questions

Questions condo boards ask about the three

Do we file a milestone report and a recertification report?

Not in Miami-Dade or Broward. The county report serves as the milestone inspection; in Miami-Dade the county says outright that no separate milestone report is filed.

Our apartment building is a rental, not a condominium. Does the milestone law reach it?

No. The milestone law reaches condominium and cooperative buildings; a rental building still answers to the county program, which covers almost every building type.

Does a recertification replace the reserve study?

No. They answer different questions: one says what condition the building is in, the other plans the money to keep it there.

Next step

Tell us about the building. We reply with a scope.

A county notice in your hand, a building that worries you or a new project — describe it and attach what you have. A phone photo of the letter is enough. You hear back from the engineer, with questions or with a written proposal.

The proposal is free. We usually reply within two hours.

info@ttcivilstructural.comMiami-Dade & Broward County, Florida