You received a recertification notice. Here is what to do first.

A letter from your building department starts a clock. Read it the same day, then follow these five steps — in Miami-Dade or in Broward.

Engineer
Juan Tercero, PE., M.Sc. · Florida PE 105256

Guide

Questions

What boards ask once the letter is open

Can we wait until closer to the date on the notice?

You can, but it costs time you will want later. An inspection booked late leaves no room if the report lists repairs, and repairs under permit move at the pace of the permit, not of the deadline.

The letter came to the management company, not to the board. Does the clock still run?

Assume it does. The office sent the notice to the address it has on record for the building; pass it to the board the same day and keep the date it arrived.

Do we need anything before we ask for a proposal?

Only the letter. The address and the age of the building tell us which county’s rules apply; drawings and the last report help, but they are not needed to start.

Is the notice the same thing as a violation?

No. A notice says the building has reached the age at which an inspection is required. Enforcement only starts when the report is not filed in time.

Next step

Tell us about the building. We reply with a scope.

A county notice in your hand, a building that worries you or a new project — describe it and attach what you have. A phone photo of the letter is enough. You hear back from the engineer, with questions or with a written proposal.

The proposal is free. We usually reply within two hours.

info@ttcivilstructural.comMiami-Dade & Broward County, Florida