Skip to content

Guide

You received a recertification notice. Here is what to do first.

A letter from your building department starts a clock. Read it the same day, then follow these five steps — in Miami-Dade or in Broward.

The short answer

  • This letter starts your county’s deadline to file, which Broward counts from the day the letter is received.
  • The week it arrives, get the letter to an engineer, even as a phone photo, with any drawings and past reports.
  • The report goes in on time even when it lists repairs, and the repairs follow afterward under permit.

The service behind this guide

Contact

Get in touch.

Tell us about the building and what you need from us. Write in English or in Spanish.

Attachments optional

Photographs, drawings or reports. PDF, images, DWG, DXF or ZIP, up to 25 MB each, five files.