Skip to content

BSIP

Building Safety Inspection (BSIP) in Lighthouse Point

Lighthouse Point’s Building Department takes questions on Broward’s Building Safety Inspection, and the city warns that firms are sending out notices of their own. Already late? One team still delivers the complete BSIP inspection and report.

Building office
Lighthouse Point Building Department

The county’s clock · in Lighthouse Point

  1. 25 years

    First due, from the certificate of occupancy — in Lighthouse Point

  2. 10 years

    Then again, every cycle after — in Lighthouse Point

  3. 180 days

    To file, from receiving the Notice — in Lighthouse Point

  4. 180 days

    To repair, from the date of the report — in Lighthouse Point

When it applies

The deadlines that apply in Lighthouse Point

For a building in Lighthouse Point, these are the dates that count, and an unanswered notice does not go away.

  • First due in Lighthouse Point: At 25 years, counted from the certificate of occupancy.
  • Then in Lighthouse Point: Every 10 years.
  • Time to file in Lighthouse Point: 180 days from receiving the Notice of Required Inspection. Older guides still say 90 days; the policy in force since August 9, 2024 gives 180. The letter you received states its own date.
  • If repairs are needed in Lighthouse Point: 180 days from the date of the report, under permit, unless the Building Official sets a different time.
  • Condominiums & co-ops in Lighthouse Point: The BSIP report serves as phase one and phase two of the state milestone inspection.

Broward County’s rows, for Lighthouse Point. Source: Broward County Board of Rules and Appeals, Policy #05-05 · Florida Building Code, Broward County Amendments, Section 110.15 · Last verified:

Your city

How the Building Safety Inspection Program runs in Lighthouse Point

In Lighthouse Point the Building Safety Inspection Program (BSIP) is Broward County’s requirement, and the city’s Building & Zoning page sends every question about it to the Lighthouse Point Building Department. The page is brief: it says which buildings are exempt and cautions owners about notices from private firms.

Whose requirement it is
Lighthouse Point’s page presents the inspection as a Broward County requirement, under a heading that says so, and applies it to buildings past the county’s age and above a floor area the page gives. The age itself is printed in “First due”, higher on this page.
Who is exempt
Single-family homes, duplexes and every building below that floor area are exempt, Lighthouse Point’s page says, and it tells those owners plainly that they are not required to have the inspection. For any other building, the age and the size together decide whether the program reaches it.
Notices from private firms
The city says it is aware that engineering and architectural firms are sending out notices about the Building Safety Inspection requirements. Lighthouse Point reminds owners who get one that their property may not be subject to the requirement at all, and states that it endorses none of the firms sending them.
Questions and permits
Questions about the inspection go to the Lighthouse Point Building Department, the page says. The department accepts new permit applications online, through its Building Department Public Portal, and in person; the page does not say how the inspection reports themselves are filed, so we ask the department before anything is submitted.

Building office Lighthouse Point Building Department 3701 NE 22 Avenue Lighthouse Point, FL 33064 Phone: (954) 943-6509

Read on the website of the Lighthouse Point Building Department:

What the BSIP inspection includes in Lighthouse Point

  • Structural inspection
  • Electrical inspection
  • Garages & parking lots
  • Balconies, docks & seawalls
  • Tests only where needed

Who does each step

The fee

  1. From $2,000

    Fixed fee, by building size — Lighthouse Point BSIP

    Small commercial or multifamily building

  2. 3–4 days

    Signed Lighthouse Point BSIP package, after the inspection

    Urgent? 1–2 days.

  3. Free

    The written proposal

Most buildings fall in a range by size. The fixed fee for your Lighthouse Point BSIP is written in the proposal, before any work starts.

Questions & answers

Questions boards in Lighthouse Point ask

A firm sent us a Building Safety Inspection notice — does it apply to our Lighthouse Point building?

Not necessarily. Lighthouse Point’s page says engineering and architectural firms are sending notices about the requirement, that a property receiving one may not be subject to it, and that the city endorses none of those firms. If you are unsure what you have, send it to us with the address, or ask the Building Department, where the page directs every question on the inspection.

Which buildings in Lighthouse Point need the Building Safety Inspection?

Those past the county’s age and above the floor area the city’s page gives; the age is the one in “First due”. Single-family homes, duplexes and smaller buildings are exempt, the page says, so the owner of a house in Lighthouse Point does not need this inspection.

How do we file the BSIP report in Lighthouse Point?

The city’s page does not say. It sends questions about the inspection to the Lighthouse Point Building Department, and it says the department accepts permit applications online and in person, with a public portal that also shows application statuses and inspection results. We confirm with the department how it wants the reports before the complete BSIP package goes in.

Is the Lighthouse Point inspection the same as the 40-year recertification?

Yes. A building permit schedule the city posts still lists it under its former name, the 40-year inspection program required by Broward County, while the Building & Zoning page calls it the Building Safety Inspection. It is one county program, and the ages in force are those in “First due” and “Then”.

What to send

The complete BSIP inspection and report in Lighthouse Point, at a fixed fee

Send the notice you received in Lighthouse Point — from the city or from a firm, a phone photo is enough — or the address and the year the building was completed. We tell you whether the county program reaches it and, if it does, propose the complete BSIP inspection and report.

The package, part by part

Contact

Get in touch.

Tell us about the building and what you need from us. Write in English or in Spanish.

Attachments optional

Photographs, drawings or reports. PDF, images, DWG, DXF or ZIP, up to 25 MB each, five files.