Broward BSIP
Miramar’s Building Division issues the BSIP package, and every document is filed through the city’s permitting system. Here, one team delivers the complete BSIP inspection and report.
- Engineer
- Juan Tercero, PE., M.Sc. · Florida PE 105256
Your city
How the Building Safety Inspection Program runs in Miramar
Miramar’s package for the Building Safety Inspection Program (BSIP) carries the letterhead of the Building Division of the City of Miramar Building, Planning & Zoning Department. The program page sets one way to file, the city’s permitting system, and says the review is based solely on the sealed report. Here is what Miramar’s own pages say, subject by subject, and what they leave open.
- The notice
- Miramar’s program page says property owners will receive a Notice of Required Inspection; it does not say who sends it or how. If you no longer own the property, it says the Broward County Property Appraiser’s records will be checked and updated if a new owner is listed. If they still list you as owner, you must contact the appraiser directly.
- Filing the report
- All BSIP documents must be submitted through the City of Miramar permitting system, the program page says, under the permit type BSIP: Residential BSIP or Commercial BSIP. It gives that system no other name; the city’s permitting page calls its online service E-Permitting or Citizen Self Service (CSS Portal). For assistance, the program page gives a BSIP e-mail contact.
- The city’s forms
- Miramar’s applications and forms page publishes the program’s package, under a title that begins “Recertification / BSIP”. Its cover lists what is attached: information about the program, inspection guidelines, and the structural and electrical report forms. Those are the Broward County Board of Rules and Appeals’ forms; the package also holds the Broward County Uniform Building Permit Application.
- What goes with it
- Miramar’s program page lists the required documents — a BSIP Submittal Form, the Structural Report, the Electrical Report and supporting documentation, if applicable — and says the reports must be signed and sealed. The page’s FAQ words the list differently — a BSIP Submittal coversheet, a Structural Packet and an Electrical Packet — and adds that the forms must include original signatures.
- After filing
- No Building Code Inspector comes out, Miramar’s FAQ says: the review is based solely on the sealed report, and the FAQ gives an approximate time for it. Asked whether owners receive written certification, it answers that an accepted file is closed and no notice is issued; it also asks filers to include an e-mail address to receive an approved copy.
- Repairs
- If deficiencies are identified, Miramar’s page says a status letter must be provided and a final certification report is required after the repairs are completed. No inspector returns: the FAQ says a new sealed report must be submitted. Its list of what to submit asks that “No Repairs Required” be checked; the time allowed for repairs is in the rows below.
- Repair permits
- For a repair permit, Miramar’s FAQ asks for an application by a licensed and insured contractor, with the repair documentation and locations; structural calculations may be required. Whether a permit is required is a question it sends to your architect, engineer or contractor. The building need not be brought fully up to current code, it adds, though repair work may have to follow it.
- If it is late
- Miramar’s FAQ says extensions must be requested in writing. Without an extension, it says, code enforcement may begin and the building may be deemed unsafe. The program page names no hearing body; the cover of the city’s BSIP package says the Building Official shall enforce the program.
Building office City of Miramar Building, Planning & Zoning Department 2200 Civic Center Place Miramar, FL 33025 Phone: (954) 602-3200
Read on the website of the City of Miramar Building, Planning & Zoning Department:
When it applies
The deadlines that apply in Miramar
The schedule is the Broward County Board of Rules and Appeals’, printed here for a building in Miramar; the date on your own notice is the one that counts.
- First due in Miramar: At 25 years, counted from the certificate of occupancy.
- Then in Miramar: Every 10 years.
- Time to file in Miramar: 180 days from receiving the Notice of Required Inspection. Older guides still say 90 days; the policy in force since August 9, 2024 gives 180. Your city’s letter states its own date.
- If repairs are needed in Miramar: 180 days from the date of the report, under permit, unless the Building Official sets a different time.
- Condominiums & co-ops in Miramar: The BSIP report serves as phase one and phase two of the state milestone inspection.
Broward County’s rows, for Miramar. Source: Broward County Board of Rules and Appeals, Policy #05-05 · Florida Building Code, Broward County Amendments, Section 110.15 · Last verified:
Questions & answers
Questions boards in Miramar ask
How do we file the BSIP report in Miramar?
Through the City of Miramar permitting system: the program page says all BSIP documents must be submitted there, as a Residential BSIP or a Commercial BSIP. The portal the city links to for permit applications opens with “Welcome to the City of Miramar’s Development HUB”. The program page links neither its submittal form nor its coversheet, so we confirm with the Building Division which document it expects.
How do we know whether our Miramar building falls under the BSIP?
To verify whether a property is included, Miramar’s page refers owners to Broward County’s BSIP property lists. Asked about a building that is not old enough, its FAQ says the Building Division will verify the age with the Broward County Property Appraiser’s Office. Interior demolition or renovation does not exempt a building, it says: only full building demolition qualifies. A building to be demolished within months still needs the inspections, it adds, particularly if still occupied.
Does Miramar send an inspector to our building for the BSIP?
No. Miramar’s FAQ says no Building Code Inspector comes out: the review is based solely on the sealed report. None returns after repairs either — a new sealed report must be submitted. The city also says it cannot recommend architects or engineers, because of conflict of interest.
What happens in Miramar if the BSIP report is late?
Miramar’s FAQ says extensions must be requested in writing and that, without one, code enforcement may begin and the building may be deemed unsafe. It does not say who receives the request or how long an extension lasts. If the date on the notice for your Miramar building has already passed, send it to us anyway: we confirm with the Building Division what it is asking for and by when.
Is the BSIP in Miramar the same as the 40-year recertification?
Yes. Miramar’s own documents use more than one name for it: on the forms page the title of the program’s package begins “Recertification / BSIP”, and the package’s cover still speaks of a “40-year inspection”, the program’s former name. One of the program page’s FAQ questions also prints a different number of days from the page’s own timeline; the ages and days in force are the county’s, in the rows above.
One team
The complete BSIP inspection and report for a building in Miramar
Next step
Send the notice for your Miramar building — a phone photo is enough — or, with no letter yet, the address and the year of the certificate of occupancy. We read what Miramar’s Building Division asks for and reply with a proposal for the complete BSIP inspection and report.
Next step
A county notice in your hand, a building that worries you or a new project — describe it and attach what you have. A phone photo of the letter is enough. You hear back from the engineer, with questions or with a written proposal.
The proposal is free. We usually reply within two hours.